< Back to List

Building Product Manufacturers: Winning the specifications game with a CRM

The Great Game of Specifications

Winning at the great game of specifications in commercial construction is complex, laborious, and simple… trench warfare.  There are so many moving pieces to keep track of that it becomes almost mind-bending difficult to really excel.  

Fortunately, tracking large databases and automating complex processes is exactly what a CRM is designed for.  At Hunley, we’ve been working to perfect this process in Salesforce.com for fifteen years; we break it down into seven elements:

  1. Capture
  2. Conserve
  3. Flip
  4. Maximize
  5. Hold
  6. Bid
  7. Close


Capture:  Grab every project as it emerges

There’s a giant, swirling sea of construction projects out there.  They range from a trivial renovation in a rundown strip mall to the construction of a new World Trade Center.  And they may come onto your radar when they’re a concept-stage twinkle in the eye of a developer … or mid-construction when subcontractors are already being selected.

The key is to capture each one as soon as it emerges.  A substantial majority, naturally, will come to you through the Dodge or ConstructConnect databases – which can be automated to flow straight into Salesforce, with an automated assignment to the territory manager covering that geography.  And any project a rep, a contractor, or an architect surfaces for you should go straight in there as soon as it’s spotted.


Conserve:  Optimize how you spend your precious time by tracking the projects that matter

Once you spot it, qualify it.  Once! (Wouldn’t it be lovely to leverage Dodge and ConstructConnect without the continuous stream of fresh updates … on projects you already know about?)

 

Quickly categorize the project.  Relevant building type for you? Big enough to be worthy of your time?  If the spec is out, is your product/product category included?

 

If it meets your criteria, put it in the pipeline and commence the chase.  If it’s not, disqualify it, and don’t let it clutter up your eyeballs again.  Then leverage the Dodge / CC sync and let the CRM prompt you when relevant updates happen.


Flip:  Substitute out your competitors if you’re not written in

If you didn’t get a chance (or didn’t have the time) to dance the dance with the specifier during the design phase, and the specification emerges with only your competitors listed, well, dang!

 

Now, if you’re on your game, you naturally get another bite at that apple.  You can submit a substitution request if you’re timely. And if you have the time to put it together.  Cuz those things are a bit of a form-filling paper storm exercise, right?

 

Hmm.  Not so much with a well-architected CRM.  Because we can alert you as soon as the spec emerges and then completely automate the substitution process down to just a click to pull the right records from the database and send the package to the architect.

 

Got Your Attention?

Cliffhanger alert!  To be continued. You’ll have to wait for the next blog post to hear the rest of the story.  (Actually, there was just too much to say to fit into one post, but anyway …)

 

Subscribe here.. and do not miss our next post!

Keep up to date with the latest from our Salesforce Success blog!

Enroll now

The Hunley Group is an amazing partner. They work with our team consistently to ensure that we’re doing our best work.

Sales Manager, Forta

Ready to transform your business?

Get Started